•      Sat Nov 23 2024
Logo
Sanjen power project conducts breakthrough of pilot hole

Rasuwa, Aug 29: Sanjen Hydropower Project conducted breakthrough of the pilot hole of its 227-meter-long penstock tunnel at Chilime in Ama Chhodingma Rural Municipality-5 of Rasuwa, on Tuesday. As the work progresses, a pilot hole will be constructed before keeping the penstock. After the pilot hole is dug, it is