• Thu Jun 4 2026
Logo
Congested bridges along Postal Highway being expanded to four lanes

Banke, April 10: Congested bridges along the Nepalgunj-Gularia Postal Highway are to be expanded to four lanes. The existing bridges with two lanes are being widened to level up the four-lane road. Once bridges according to the four-lane road are constructed, traffic movement will turn easier, said Leela Bahadur Bhandari,