•      Sun May 19 2024
Logo
Kushma-New Butwal 220 KV transmission line comes into operation

Kathmandu, Dec 11: The power transmission line of 220 KV along the Kaligandaki corridor has come into operation. With the beginning of the transmission line, power supply to the districts of Nawalparasi and Rupandehi is expected to remain stable. Minister for Energy Shakti Bahadur Basnet on Monday inaugurated the transmission

Kaligandaki corridor obstructed with landslide

The Kaligandaki corridor has been obstructed due to landslide triggered by incessant rain. Deputy Superintendent of Police (DSP) at the

Kaligandaki corridor restricted for night-time vehicular movement

Police have restricted night-time vehicular movement along the Kaligandaki corridor in Nawalparasi (Bardaghat-Susta-East).

Kaligandaki Corridor road blocked by landslides

The Baglung section of the Kaligandaki corridor road has been blocked by a landslide. The section remains blocked for traffic

Landslide obstruct Mid-Hill highway, Kaligandaki corridor

Vehicular movement along Mid-Hill highway and Kaligandaki corridor has been obstructed due to landslide following heavy rainfall.