• Thu Jun 4 2026
Logo
Construction works begin for Myagdi corridor transmission line

Myagdi, April 2: Construction works have begun for the 132-KV transmission line under the Myagdi Corridor. The double and multi-circuit transmission lines would be forwarded with three projects to be built in the Myagdi River. The electricity generated from the undertaking would be linked to the national transmission line. The