•      Thu May 2 2024
Logo
Kushma-New Butwal 220 KV transmission line comes into operation

Kathmandu, Dec 11: The power transmission line of 220 KV along the Kaligandaki corridor has come into operation. With the beginning of the transmission line, power supply to the districts of Nawalparasi and Rupandehi is expected to remain stable. Minister for Energy Shakti Bahadur Basnet on Monday inaugurated the transmission