© 2024 All Rights Reserved Enewspolar
Rasuwa, Aug 9: The Simbu Hydropower Centre, constructed by the Sanjen Hydropower Company, has started generating electricity. The hydropower project which was constructed in the name of Upper Sanjen with the 14.8 MW capacity has started producing energy since August 5. The energy produced from the hydropower project has been