© 2024 All Rights Reserved Enewspolar
Myagdi, Feb 22: Construction of three hydropower projects has begun in Mudi, Dhaulagiri Rural Municipality-4 of the district. Construction of three hydropower projects with a capacity of 155 megawatts has begun on the Myagdi River flowing from the foothills of Mt Dhaulagiri. The 53.5 megawatt Upper Myagdi-I, the 65 megawatt

Birtamod municipality in the district has distributed 325 chaff cutters to the farmers involved in animal husbandry. The municipality provided

The country recorded the loss of Rs 861.38 billion in the foreign trade of total Rs 1,115.79 billion done in

The CPN (Maoist Centre) Chairman Pushpa Kamal Dahal ‘Prachanda’ has taken a direct jab at former King Gyanendra Shah, stating

Nepali Congress leader Dr Shekhar Koirala has accused Rastriya Swatantra Party (RSP) President Rabi Lamichhane of embezzling cooperative funds, insisting

Kathmandu Metropolitan City Mayor Balendra Shah has highlighted the need to promote local food, culture, and traditions.

Until last year, Nepal imported tiles worth Rs 14 billion from India, but domestic production now meets 80% of the

In the third match of Group B at the ICC Champions Trophy 2025, South Africa won by 107 runs against

The CPN (Maoist Centre) is set to launch the 'Maoist Public Awareness Campaign with the People' along the Postal Highway

Prime Minister KP Sharma Oli has assured that the government will not take any action that violates the right to