© 2024 All Rights Reserved Enewspolar
Kathmandu, April 20: The Dudhkoshi Hydropower Project-5 with a capacity of 110 megawatts is to be built in Dudhkoshi river in Solukhumbu district. As proposed by the developer, the project would be located at wards no. 2, 3, 4, 6 and 7 in Mapya Dudhkoshi Rural Municipality. The Electricity Development

Minister for Energy, Water Resources and Irrigation Kulman Ghising has urged the Asian Development Bank (ADB) to sort out the