© 2024 All Rights Reserved Enewspolar
Kathmandu, March 28: The preparation of the detailed project report (DPR) of the railway from Raxaul to Kathmandu has started. According to Nepal Railway Company Limited, the possibility of a total length of 136 kilometers of railway has been studied and the final preparation of DPR has begun. "The technical team
Kathmandu, Oct 31 : The government has finalised a Preliminary Engineering and Traffic (PET) report of proposed 135-kilometre-long Kathmandu-Birgunj electric