© 2024 All Rights Reserved Enewspolar
Myagdi, March 15: Electricity generated by the 22.5 MW capacity Upper Thulokhola Hydropower Project has been connected to the central grid. The electricity was connected to the central grid after completing the construction of the physical structure, installation of equipment and internal testing of the project constructed by Thulokhola Hydropower