© 2024 All Rights Reserved Enewspolar
Kathmandu, Dec 28: Cross-border movement at the Jilong or Rasuwagadhi (Gyirong) Port, a key trade point between Nepal and China, is set to resume following disruptions caused by a flash flood disaster. The port had been closed after sudden flooding on July 8 damaged roads in the port area, bringing

A flood from the Lhende Stream along the Nepal-China border in Rasuwa district last night damaged the Syafrubesi-Rasuwagadhi road, leading

Minister for Physical Infrastructure and Transport, Devendra Dahal, has informed that installation of a bailey bridge on the Lhende stream

The Chinese side has started the construction of a Bailey Bridge under the first phase of resuming the border check

Nepal imported Chinese goods worth Rs 65.22 billion via the Rasuwagadhi customs point in the last fiscal year.

Chinese electric vehicles brought into Nepal through Rasuwagadhi border have been stopped at Timure.

Chinese tourists have started entering Nepal through Rasuwagadhi Check Point, the northern border of Nepal. A total of 26 tourists

An understanding has been reached to fully resume bilateral trade and people's movement through the Rasuwagadhi-Kerung border from coming April

The goods that are being imported to Nepal for Dashain festival are stopped in Tibet region.

Kathmandu . Imports through Rasuwgadhi checkpoint have been halted till local-level election. The local-level election is taking place across the