© 2024 All Rights Reserved Enewspolar
Myagdi, July 10: Test production of a 220-KV Chimkhola-Rahughat transmission line, constructed to connect power produced from hydropower projects at Rahughat basin of Myagdi district to central system, is being conducted. A 13-kilometer long transmission line was constructed from Chimkhola to switchyard of Galeshwor-based Ragughat hydropower project to connect power

Minister for Home Affairs, Ramesh Lekhak, has urged everyone not to comment about government based on the speculation and imagination.

The Special Court has been granted the International Organization for Standardization (ISO) certification in recognition to the court’s ability in

Meteorologists and hydrologists are having a tough time in determining the exact causes behind the massive flood in the Bhotekoshi

The Members of House of Representatives (HoR) have expressed grief over the losses of significant number lives and property from

The Narayanghat-Butwal road section along the East-West Highway has been completely shut down after a landslide swept away some sections

The Myagdi river was blocked from this afternoon following a landslide from a cliff at Basbot of Dhaulagiri Rural Municipality-4

The Rastriya Swatantra Party (RSP) and the Rastriya Prajatantra Party (RPP) continued their protests in the House of Representatives (HoR)

The Ministry of Health of the Bagmati Province has installed 16 dialysis machines in the province hospitals in different districts.

Nepali Police has been undertaking a search operation for those 19 people reported missing in the flooding in Rasuwa since