•      Sat Nov 23 2024
Logo
DPR of Raxaul-Kathmandu railway within a month

Kathmandu, March 28: The preparation of the detailed project report (DPR) of the railway from Raxaul to Kathmandu has started. According to Nepal Railway Company Limited, the possibility of a total length of 136 kilometers of railway has been studied and the final preparation of DPR has begun. "The technical team