© 2024 All Rights Reserved Enewspolar
Kathmandu, July 7: Power production plants across the country have been affected due to floods triggered by incessant rainfall. As a result, power supply has been interrupted in some places. According to the Nepal Electricity Authority (NEA), power plants that produce about 640 megawatts of electricity have been shut down
Mere construction of hydropower project is not sufficient. Equally important is the construction of transmission line substation. Only after the