© 2024 All Rights Reserved Enewspolar
Damauli, March 31: The under-construction 140-megawatt Tanahu Hydroelectricity Project witnessed a breakthrough of its headrace tunnel. The reservoir-based project utilizes water from the Seti River, flowing along the border of Rhishing Rural Municipality and Byas Municipality-5 in Tanahu. Kulman Ghising, the Managing Director of the Nepal Electricity Authority (NEA), and
Tabling the motion, Minister Basnet said the ISA was formed with the goal of increasing energy accessibility and guaranteeing energy
The High-level Recommendation Committee on Tax System Reforms has submitted its study report to the government.
Prime Minister Pushpa Kamal Dahal 'Prachanda' has directed the subordinate bodies to investigate the issue of fake bills and use
Stakeholders in Nepal have called for augmenting human resources, their capacity and mandate, and establishing a dedicated mechanism to address
Of the 13.3 km tunnel of this national pride project, only 790 m is left to be completed, according to
Minister for Industry, Commerce and Supplies Damodar Bhandari said that the government was mulling to put in place a policy
The Department of Mines and Geology has issued permit for extraction to 159 mines that were explored at different times.
Inaugurating the horticulture exhibition organized by the Nursery Association Nepal (NAN) at local Bhrikutimandap today, he emphasized on increasing flower
Minister for Energy, Water Resources and Irrigation Shakti Bahadur Basnet has said that the climate change has the most impact