•      Fri Dec 5 2025
Logo
Blacktopping completes in Diktel-Halesi roadway

Khotang : The Diktel-Halesi section of the mid-hill highway has been blacktopped. The 36-km roadway was blacktopped with the financial assistance of the Asian Development Bank. Project chief Bijay Kumar Thapa said the roadway was widened and pitched with the cost of Rs 48 million. Although it was planned to