•      Tue Oct 1 2024
Logo
140-mw Tanahu Hydropower sees breakthrough of headrace tunnel

Damauli, March 31: The under-construction 140-megawatt Tanahu Hydroelectricity Project witnessed a breakthrough of its headrace tunnel. The reservoir-based project utilizes water from the Seti River, flowing along the border of Rhishing Rural Municipality and Byas Municipality-5 in Tanahu. Kulman Ghising, the Managing Director of the Nepal Electricity Authority (NEA), and